[ | ]   

FEHRLopedia

content name:
 

Road maintenance optimisation modelling is usually undertaken to assist road agencies plan and budget for their maintenance activities. It can promote best use of available funds by helping determine the types and timings of treatments to be carried out. At a higher level, it can help determine appropriate levels of maintenance funding.
This paper has identified two distinct types of underfunding compared with the unconstrained optimum. The first concerns the present value of funds made available for maintenance, which can be measured by the ‘maintenance deficit’. There is a variety of ways to define and measure the maintenance deficit, and different standards against which to compare actual funding levels — the unconstrained optimum, the level of spending required to achieve the same MBCR as for investment spending, and the level of spending required to attain predetermined minimum acceptable standards.
Economically efficient allocation of funds between maintenance and investment spending requires the Marginal Benefit-Cost Ratio (MBCR) for maintenance and the MBCR or cut-off Benefit-Cost Ration (BCR) for investment spending to be the same. If they are not, the return to society from road expenditure can be improved by shifting funds from the budget with the lower MBCR to the budget with the higher MBCR.
The second type of underfunding identified in the paper occurs when maintenance deferral increases the present value of maintenance costs without any improvement in the user cost outcome. It occurs when tight short-term annual budget constraints force a departure from the most efficient funding profile over time. This profile can be estimated by an optimisation model set up to minimise total transport costs subject to a budget constraint expressed as a present value. If preventative maintenance that protects and preserves road pavements is deferred, components of the assets can be damaged, and the future cost of restoration can exceed the short-term saving, even after adjusting for the time value of money. Departing from the cost-minimising time path to achieve the lowest acceptable standards by deferring maintenance is equivalent to going into debt.
This paper has proposed a way to use maintenance optimisation models to estimate an ‘equivalent interest rate for maintenance deferral’, which enables comparisons to be made between the cost of borrowing through maintenance deferral and conventional borrowing.

   
content link: http://www.oecd-ilibrary.org/docserver/download/5k8zvv39tt9s.pdf?expires=1357287512&id=id&accname=guest&checksum=03E963A3017522E1A454C08765F294D2
   
content language: English
English summary: no
unrated
If you want to rate, please register or log in.
 
user comments  
This content is related to:
 
project type
International projects 
area of interest
 maintenance management
 MOBILITY & TRANSPORT
 DESIGN & PRODUCTION
user type
road authorities/owners 
research labs 
construction companies 
consultancies 
Other similar contents:

The similarity algorithm calculates how much two contents in the system are similar to one another. So far, similarity is calculated based on similarity of the project type, area of interest and user type. Generally, if two contents have more parameters in common they are more similar to each another. More information.

content description similarity (%)
created: RC User, 04.01.2013 09:23:08
last modified: RC User, 27.05.2013 09:52:54

 

 

While we are still building the FEHRLopedia with the help of experts like yourself, you may find that not all subjects are covered as deeply as you need. Therefore if you don't find the results you are looking for, please try the CERTAIN custom Google search. We would be grateful if you would create new content for the FEHRLopedia from your results. Thanks for your assistance in building the system.